Knowledge Base
Add new doc from here
User Interface and Accessibility
1
Admin Modules
14
Permit to Work Module
10
- Search Prerequisite (LOA, RA, & SWP)
- Completion of PTW
- Duplicate PTW
- Duplicate Tool Box Meeting
- Selection of multiple attachments (LOA, RA, SWP, and Other Prerequisite)
- Toolbox Meeting multiple select worker
- PTW Submission
- Submit Toolbox Meeting form
- Bulk upload LOA (Letter of Appointment), RA (Risk Assessment), and SWP (Safe Work Procedure)
- Change Project Status
Safety Inspection
8
- Confirm and Conduct Inspection Request – Found Issue (by RE)
- Submit Inspection Request by PE (Project Engineer)
- Resubmit Inspection request by PE
- Take corrective action by PE
- Project Role for RERTO Inspection module
- Download RERTO Inspection report
- Single Download RERTO Inspection
- Multiple Download RERTO Inspection
Site and Internal Inspections
9
- Assign user to Project as Project Supervisor (Site Inspection)
- Assign user to Project as Project Engineer (Site Inspection)
- Submit Steel Reinforcement Bending Schedule
- HSSE Inspection
- Submit Reinforcement Inspection Checklist
- Verifying the Site Inspection checklist
- Submit Checklist for Formwork Inspection
- Submit Concreting Checklist
- Project Role for HSSE Inspection Module
Manpower Management
2